ADU Rules

ADU Wizard

The Wizard tool is a starting point to imagine and explore possible options on your property. For the most accurate and up-to-date information, particularly for properties in a shoreline zone, check in with your town’s planning and/or code enforcement staff.

Overview

  • Learn what you can build on your property
  • Understand local rules
  • Meet with local staff to discuss your project

Before you start dreaming up your ADU, you need to know what you’re allowed to build. We will help you navigate the state and local laws that apply to your property.

Project Timeline

Learning the rules is part of the Planning phase, which typically takes 1-3 months. Most ADU projects take 12-18 months to complete, but some extend to 24 months or more.

Timeline graphic with the planning phase highlighted, taking 1-3 months

FAQs

Note: Learning the rules about ADUs includes quite a few topics. Find the answers to these questions in the content below:

  • Am I allowed to build an ADU? How many?
  • Can I put an ADU in my garage?
  • How large can my ADU be?
  • Do I need to live in the main house or ADU?
  • Can I rent my ADU as an AirBNB or other short-term tenal?
  • Will I need to add parking?
  • What if my property is in an Historic District or other special zone?
  • I have a septic system or well – can I still build an ADU?

Learning the Rules, Step-by-Step

Keep in mind Understanding how local and state rules apply to your project can feel like a lot at first. Remember: Local staff are here to help. Contact Planning staff for your location to ask all your ADU questions. You may also want to check out our Glossary to get familiar with key terms.

Step 1

Use the ADU Wizard to See What’s Allowed on Your Lot

Insert your address above to be redirected to our ADU Wizard tool, which uses artificial intelligence to provide zoning information about your property.  Note: This is just a first step and you will want to contact your code enforcement officer or the planning department in your municipality before making any decisions.

Using the ADU Wizard, local assessor websites, and public GIS portals, gather the following information:

  • Parcel/Map/Block/Lot Number
  • Lot size
  • Zoning district
  • Any overlay zones (e.g., historic or coastal zones).

Step 2

Learn What You Can Build

Using the ADU Wizard (see above) and your local planning and building website, learn about what you can build.

Make sure you learn about:

  • Maximum size (most towns allow 600–1,000 sq ft)
  • Height limits
  • Setback and lot coverage requirements
  • Whether garage or basement conversions are allowed

Statewide rules to keep in mind:

  • Single-family homes are allowed only one ADU.
  • Multi-family properties (such as duplexes, triplexes, and larger apartment buildings) are allowed to add:
    • Up to two detached ADUs total, and
    • Additional internal or attached ADUs, provided the total number of new units does not exceed 25% of the existing number of units on the property.

Local ordinances may further regulate or expand these allowances, so it is important to check with your municipal planning department for exact rules and any exceptions.

Step 3

Learn About Special Zones

Some properties are located within special zoning areas that include additional standards affecting where and how an Accessory Dwelling Unit (ADU) may be developed. Property owners should confirm whether their property is located within any of the following:
 

Shoreland Zoning Districts

Properties near rivers, streams, ponds, wetlands, or the coast may fall within Shoreland Zoning districts, which are designed to protect water quality, habitat, and scenic resources.
 
The four Shoreland Zoning districts include:
 

The most restrictive district. ADUs and other types of development may be limited or prohibited depending on site conditions.

Other Shoreland districts with varying levels of restriction.

 

Other Special Zones

Some properties may also be subject to additional regulations under:
 

Regulated by: FEMA, local floodplain ordinances

Description: Includes coastal and riverine floodplains (e.g., AE, VE zones). Portland and many coastal communities have these.

Implications: Elevation requirements, development restrictions, and insurance impacts. Building an ADU may be cost-prohibitive or require special permitting.

Check Flood Maps: FEMA Map Service Center

Regulated by: Local Historic Preservation Commissions, Maine Historic Preservation Commission

Description: Many Maine towns (e.g., Portland, Bath, Hallowell) have designated Historic Districts or individually listed buildings.

Implications: Exterior changes often require review or Certificate of Appropriateness. ADUs may face design compatibility requirements.

Reference: Maine Historic Preservation Commission

Regulated by: Maine Forest Service

Description: Maine has low to moderate wildfire risk overall, but some inland or rural forested areas may face higher risk.

Implications: Less strict than California’s fire hazard zones, but defensible space may be encouraged for new structures.

Reference: Maine Forest Service

Regulated by: Local municipalities under Shoreland Zoning

Description: Sensitive environmental areas—like fragile wetlands, steep slopes, or wildlife habitat—may be designated RP zones.

Implications: Typically the most restrictive zone in a municipality; new structures (including ADUs) are often not allowed

Regulated by: Local zoning and land use codes

Description: Many Maine municipalities define “growth” and “rural” areas in their comprehensive plans to manage sprawl.

Implications: ADUs may be encouraged in growth areas and discouraged or limited in rural zones depending on infrastructure and policy goals.

Step 4

Learn Other Key Rules

Owner Occupancy: Maine’s state law (LD 2003) does not require the property owner to live on-site for an ADU to be permitted. 

Short-term Rentals: Some towns regulate or restrict short-term rentals in ADUs, especially in areas with high housing demand or limited inventory. For example, Portland requires registration and limits the number of short-term rental units per property. Confirm your town’s requirements before listing an ADU on a platform like Airbnb.

Septic/Well: If your property is not connected to public sewer or water systems, you may need to update or expand your septic system or water supply to accommodate the additional unit. This usually involves hiring a licensed site evaluator and getting approval from your local plumbing inspector or the Maine Department of Health and Human Services. Properties with limited capacity may face design or size constraints.

Step 5

Contact Utilities

Reach out to providers (sewer, water, electric) early to understand connection requirements and fees. Water districts in Maine commonly require separate meters and connections.

Step 6

Meet With Local Staff

Each town handles ADUs a little differently. Contact your local planning department early in the process.

Ready to ADU?

Navigate project phases using this section on each page.

← ADU 101

Go back to basics

Inspiration →

Get started and set goals

Need help with ADU rules?

Check out these resources for help.

ADU Wizard Thumbnail

ADU Wizard

Input your address and see what’s allowed on your lot.
ADU Wizard Resource Page